CPS Scope:
Plumbing Installations
Sanitary hub less cast iron system, Storm drainage,
Underground ductile iron water & fire supply system, Copper hot & cold water reticulation system, Sanitary fixtures, Waste water treatment plant, Pumping systems for; booster, irrigation, sewage lift station, elevator shaft sump pumps and hot water circulation.
Fire Systems
Above ground fire system using Globe sprinklers and Victarlic connections, Peerless vertical engine driven fire pumping system.
|
Client:
US State Department
Main Contarctor:
Zachry Constrution Corporation
Location:
Phnom Phen, Cambodia
Contract Period:
November 2003 – August 2005
Project Work:
Constrution of the new American Embassy Buildings
including the Consular Office Building, Utility Buildings,
Guard Posts and main accommodation areas.
|